Canadarm Ready to Ensnare Space Dragon after March 1 Blast Off

BDFrSM-CEAIU7I7.jpg-large.jpg

Wouldn't you love to wake up to this gorgeous view of our home planet as a big hand waves a friendly good morning ?!

Well, having survived high speed wayward

Asteroids

and

Meteors

these past few days, the human crew circling Earth aboard the International Space Station (ISS) is game to snatch a flying Space Dragon before too long.

NASA

will dispatch astronaut fun to orbit in the form of the privately built SpaceX Dragon in a tad less than two weeks time that the crew will ensnare with that robotic hand from Canada and join to the ISS.

On March 1 at 10:10 AM EST, a Space Exploration Technologies (SpaceX) Falcon 9 rocket is slated to blast off topped by the Dragon cargo vehicle on what will be only the 2nd commercial resupply mission ever to the ISS.

The flight, dubbed CRS-2, will lift off from Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida carrying about 1,200 pounds of vital supplies and

science

experiments for the six man international crew living aboard the million pound orbiting outpost.

[caption id="attachment_100039" align="aligncenter" width="580"]

SpaceX Dragon spacecraft stands inside processing hangar at Cape Canaveral Air Force Station in Florida. Teams had just installed the spacecraft's solar array fairings. Credit: NASA/Kim Shiflett[/caption]

The ISS would plummet from

the sky

like a flaming, exploding meteor and disintegrate without periodic and critical cargo and fueling resupply flights from the ISS partner nations.

There will be some heightened anticipation for the March 1 SpaceX launch following the premature shutdown of a 1st stage Merlin engine during the last Falcon 9 launch in 2012.

The solar powered Dragon capsule will rendezvous with the ISS a day later on March 2, when

NASA

astronauts Kevin Ford and Tom Marshburn will reach out with the Canadian built robotic marvel, grab the Dragon by the proverbial "tail" and attach it to the Earth-facing port of the station's Harmony module.

The Dragon will remain docked to the ISS for about three weeks while the crew unloads all manner of supplies including food,

water

, clothing, spare parts and gear and new science

experiments

.

Then the astronauts will replace all that cargo load with numerous critical experiment samples they have stored during ongoing research activities, as well as no longer needed equipment and trash totaling about 2300 pounds, for the return trip to Earth and a Pacific Ocean splashdown set for March 25 - as things stand now.

[caption id="attachment_100040" align="aligncenter" width="386"]

SpaceX Falcon 9 rocket before May 2012 blast off from Cape Canaveral Air Force Station, Florida on historic maiden private commercial launch to the ISS. Credit: Ken Kremer/www.kenkremer.com[/caption]

SpaceX is under contract to NASA to deliver about 44,000 pounds of cargo to the ISS during a dozen flights over the next few years at a cost of about $1.6 Billion.

SpaceX comprises one half of NASA's Commercial Resupply Services program to replace the cargo up mass capability the US lost following the retirement of NASA's space shuttle orbiters in 2011.

SpaceX also won a NASA contract to develop a

manned version of the Dragon capsule

and aims for the first crewed test flight in about 2 to 3 years - sometime during 2015 depending on the funding available from NASA.

The US is now totally dependent on the Russians to loft American astronauts to the ISS on their Soyuz capsules for at least the next 3 to 5 years directly as a result of the shuttle shutdown.

Along with SpaceX, Orbital Sciences Corp also won a $1.9 Billion cargo resupply contract from NASA to deliver some 44,000 pounds of cargo to the ISS using the firm's new

Antares rocket and Cygnus capsule

  • launching 8 times from a newly constructed pad at NASA's Wallops Island Facility in Virginia.

The maiden launch of Orbital's Antares/Cygnus system has repeatedly been delayed - like SpaceX before them.

NASA hopes the first Antares/Cygnus demonstration test flight will now occur in March or April. However, the Antares 1st stage

hot fire test

scheduled for earlier this week on Feb. 13 had to be aborted at the last second due to a technical glitch caused by a low nitrogen purge pressurization.

For the SpaceX launch, NASA has invited 50 lucky social media users to

apply for credentials

for the March 1 launch

Watch for my upcoming SpaceX launch reports from the Kennedy Space Center and SpaceX launch facilities.

Ken Kremer

[caption id="attachment_100042" align="aligncenter" width="580"]

SpaceX technicians lift a solar array fairing prior to installation on the company's Dragon spacecraft. The spacecraft will launch on the upcoming SpaceX CRS-2 mission. Credit: NASA/Kim Shiflett[/caption]