Categories: Commercial Space

Sierra Nevada Dreamchaser Will Launch on First Orbital Flight Test in November 2016

Commercial space company Sierra Nevada Corporation and NASA announced plans today to launch an orbital test flight of the Dream Chaser vehicle in 2016, and that they plan to use processing facilities at Kennedy Space Center as well as land the vehicle at NASA’s Shuttle Landing Facility in Florida.

“Today we’re very proud to announce that we have now formally negotiated our orbital spaceflight,” said Mark Sirangelo, the head of Sierra Nevada Space Systems. “We have acquired an Atlas V rocket and established a launch date of November 1, 2016, so in a little over two years from now and we’re going to be taking our vehicle to space on the board one of the best rockets that has ever been designed, the Atlas V.”

The mission will be automated and unmanned, but if all goes well Sierra Nevada hopes to have a human flight by sometime in 2017.

The Dream Chaser space plane atop a United Launch Alliance Atlas V rocket. Image Credit: SNC

The seven-passenger vehicle looks like a mini-space shuttle and is about 9 meters long (29.5 feet) with a wingspan of 7 meters (22.9 feet).

Sirangelo said they will be doing Dream Chaser pre- and post-flight processing at KSC along with Lockheed Martin at the Operations and Checkout (O&C) facility at KSC. The O&C is an historic facility which was originally built to process Gemini and Apollo era spacecraft. After significant upgrades by NASA and the State of Florida, it is currently being used by Lockheed Martin Space Systems to develop, assemble and test NASA’s Orion spacecraft.

The 2017 flights will be the first time an Atlas V will be used to send people to space since the Mercury program. The landing at the SLF will be the first landing of a space vehicle there since the final space shuttle mission, STS-135, landed there on July 21, 2011.

“That is way too long (between landings),” said Steve Lindsey, former NASA astronaut and now Sierra Nevada’s Dream Chaser program manager, “and we intend to do something about it and do it very soon… We want to continue the long tradition that was started on the Florida space coast so many years ago.”

During a question and answer period with media, questions were asked about which entity is paying for which portions of the launch and processing. But the officials were coy about not answering those questions directly.

Officials from NASA, Sierra Nevada, Lockheed Martin, United Launch Alliance and Space Florida took part in the announcement, which you can watch below.

“Today’s announcement confirms the faith the commercial industry has in Kennedy Space Center,” said Bob Cabana, the director of Kennedy Space Center.

Left landing gear failed to deploy as private Dream Chaser spaceplane approaches runway at Edwards Air Force Base, Ca. during first free flight landing test on Oct. 26, 2013 – in this screenshot. Credit: Sierra Nevada Corp.

The Dream Chaser had a test landing in October, 2013 after it was hoisted in the air by a helicopter. The automated landing went well except that one of the landing gears failed to deploy properly.

Sierra Nevada announced last week that they had completed their latest milestone for the NASA’s commercial crew program, the Commercial Crew Integrated Capability (CCiCap), Milestone 7, which is the Certification Plan Review for the entire Dream Chaser Space System. They delivered nearly 6,000 pages of technical documentation on the strategy, verification, and validation of Dream Chaser and its integration with the Atlas V launch vehicle and ground mission control systems.

Nancy Atkinson

Nancy has been with Universe Today since 2004, and has published over 6,000 articles on space exploration, astronomy, science and technology. She is the author of two books: "Eight Years to the Moon: the History of the Apollo Missions," (2019) which shares the stories of 60 engineers and scientists who worked behind the scenes to make landing on the Moon possible; and "Incredible Stories from Space: A Behind-the-Scenes Look at the Missions Changing Our View of the Cosmos" (2016) tells the stories of those who work on NASA's robotic missions to explore the Solar System and beyond. Follow Nancy on Twitter at https://twitter.com/Nancy_A and and Instagram at and https://www.instagram.com/nancyatkinson_ut/

Recent Posts

What’s the Most Effective Way to Explore our Nearest Stars?

It was 1903 that the Wright brothers made the first successful self-propelled flight. Launching themselves…

2 hours ago

Radiating Exoplanet Discovered in “Perfect Tidal Storm”

Can tidal forces cause an exoplanet’s surface to radiate heat? This is what a recent…

9 hours ago

The Giant Planets Migrated Between 60-100 Million Years After the Solar System Formed

Untangling what happened in our Solar System tens or hundreds of millions of years ago…

21 hours ago

Artemis Astronauts Will Deploy New Seismometers on the Moon

Back in the 1960s and 1970s, Apollo astronauts set up a collection of lunar seismometers…

2 days ago

Ice Deposits on Ceres Might Only Be a Few Thousand Years Old

The dwarf planet Ceres has some permanently dark craters that hold ice. Astronomers thought the…

2 days ago

The Mystery of Cosmic Rays Deepens

Cosmic rays are high-energy particles accelerated to extreme velocities approaching the speed of light. It…

2 days ago